2 electricity production plants (trigeneration facility) with 4.3 MWe power (total 8.6 MWe power) that operate with natural gas were commissioned.
Sublimation facility with 2.000.000 m²/year production capacity was commissioned.
15 m anodic oxidation facility was commissioned and aluminum anodic oxidation coating capacity reached 35.000 tons/year.
2.200 tons and 1.320 tons of extrusion profile lines were commissioned and aluminum press profile production capacity reached 70.000 tons/year.
Capacity of the aluminum composite panel production facility reached 7.500.000 m²/year with the investment on 2 new lines that were commissioned.
Aluminum Flat Products (Casting: 60.000 tons/year, Rolling mill: 140.000 tons/year, Foil: 25.000 tons/year, Painted Plate: 45.000 tons/year) production facility was commissioned.
4 melting furnaces and 2 casting machines were commissioned in the Aluminum Billet Casting Facility and the capacity was increased to 75.000tons/year.
CNC machining centers, welding robots and special treatment centers that have various capabilities were commissioned in the Mechanical Treatment and Special Productions Sections and the capacity was increased to 8.000 tons/year.
PVC production facility was increased to 22 lines and the capacity reached 25.000 tons.
Roller Shutter Slats production capacity was increased to 30.000.000 running meters/year.